ROTSCHY, INC.
GENERAL CONTRACTOR
WATER STATION 14


COMPLETED: IN-PROGESS 

$207,281.49

LOCATION: VANCOUVER, WA 

OWNER: CITY OF VANCOUVER 

BACK TO PROCESS PIPING/MECHANICAL EQUIPMENT
 This project constisted of a new On-site Hypochlorite Generation (OSHG) System replacing the existing gas chlorination system. The work also included removing the existing chlorine scrubber system and constructing the OSHG in its general location within the existing building.