WATER STATION NO.1 PHASE.2

COMPLETED: IN-PROGRESS

$18,912,400.00

LOCATION: VANCOUVER, WA

OWNER: CITY OF VANCOUVER
 

THE PROJECT WORK WILL PROVIDE THE CITY OF VANCOUVER WITH TWO NEW 4-MILLION PRE-STRESSED POST TENSIONED CONCRETE RESERVOIRS, A NEW 1 MILLION GALLON WELDED STEEL STANDPIPE, AND IMPROVED SITE SECURITY AND ACCESS. THE PROJECT REPLACES TWO EXISTING CONCRETE WATER RESERVOIRS AND AN ELEVATED STEEL WATER TOWER, AND INCLUDES; DEMOLITION, EARTHWORK, UTILITY RELOCATIONS, LARGE DIAMETER WATER PIPELINES, DRAINAGE SYSTEMS, ROADWAYS, PAVED PEDESTRIAN PATHS, TREE REMOVAL, LANDSCAPING, SITE LIGHTING, HEAVY DUTY SECURITY FENCING, SECURITY CAMERAS, DECORATIVE FEATURES, AND OTHER SITE ACTIVITIES.