ROTSCHY, INC.
GENERAL CONTRACTOR
SUBARU TRACK RELOCATION -   PROJECT 10


COMPLETED: JUNE 2015​​

$10,944,493

LOCATION: VANCOUVER, WA

OWNER: PORT OF VANCOUVER
 

         This project repositioned Port of Vancouver yard tracks utilized by Subaru Inc. to the south and included a bid alternate to construct a south terminal yard.  Track construction consisted of 136# and 115# rail totaling approzimately 20,000 track feet.  Multiple hand thrown turnouts including both No. 9 and No. 11 configurations were included within the project scope.  Other apprutenances included ties, casings, crossings, surfacing, bumpers, excavation, and drainage.
BACK TO RAIL