MCNARY POTABLE WATER DISTRIBUTION SYSTEM


COMPLETED: FEBRUARY 2016​​

$3,313,940

LOCATION: UMATILLA, OR

OWNER: UNITED STATES ARMY CORP OF ENGINEERS
 

         The new water distribution system construction work included: Liquid chlorination system; Pipe trench excavation and underground boring for railroad and roadway locations for the new potable water distribution pipelines; Site preparation for a new potable water (concrete reinforced) storage tank with chain link security fencing around it and a rip rap overflow ditch outfall section starting at the end of the water tank drainage pipe; Valves and valve groups subsurface enclosures (concrete manholes); Fire hydrant procurements and placements with protection bollards; Underground fiber optic cable procurement and placement from the new water tank to just outside the Powerhouse; Demolition of some existing valve groups piping during the construction phase to upgrade the water distribution system; and Demolition of the old water tank after de-commissioning of the old water distribution system.
BACK TO UTILITIES
  1. Managing Director
  2. Managing Director
  3. Managing Director
  4. Managing Director
  5. Managing Director