ROTSCHY, INC.
GENERAL CONTRACTOR
WATER TREATMENT PLANT
         This project constisted of constructing a new 1.5 MGD (expandable to 2.0 MGD) Pall microfiltration package water treatment plant, including a treatment plant building, electrical work, emergency power generator, HVAC, chemical feed and storage systems, raw and finished water instrumentation, associated process piping, instrumentation control and telemetry, clearwell contact chamber, yard piping, raw water transmission main, earthwork and sitework, including logging, clearing and grubbing, grading and excavation, unlined detention and infiltration ponds, driveway construction, fence installation, and septic system.  It also included reconfiguration of piping around the existing finished water tanks, new level control and other modifications to the City's existing finished water tank site, new 1.5 MGD raw water pump station at the City's Main impoundment, raw water pumps at the City's Dohman impoundment, new electrical, controls, and telemetry at both the City's raw water impoundments (Main and Dohman).


COMPLETED: JANUARY 2012​​

$4,003,930

LOCATION: LONG BEACH, WA

OWNER: CITY OF LONG BEACH
 

BACK TO PROCESS PIPING/MECHANICAL EQUIPMENT
  1. Managing Director
  2. Managing Director
  3. Managing Director
  4. Managing Director
  5. Managing Director
  6. Managing Director
  7. Managing Director