ROTSCHY, INC.
GENERAL CONTRACTOR
​WATERFRONT PARK - GRANT ST PIER
         This project consists of the removal of existing in-water piling, dolphins, trestle, and gangway and the installation of in-water piling for use as falsework support; earthwork; construction of cofferdam with permanent ground anchors; cast-in-place concrete abutment with drilled shaft piling; and backstay foundations with micropiles. Construction of cast-in-place concrete and MSE gabion retaining walls; 3,480 square foot cable stayed pier consisting of cast in place concrete, steel mast, cables, wood decking, storm drainage, railings, and lighting. Plaza construction consisting of a cast-in-place concrete base with a stone and concrete paving unit finish, cast-in-place walls, terraced wood seating and site furnishings.

COMPLETED: IN-PROGRESS

$12,318,980

LOCATION: VANCOUVER, WA

OWNER: CITY OF VANCOUVER

BACK TO CURRENT PROJECTS
  1. Managing Director
  2. Managing Director
  3. Managing Director
  4. Managing Director
  5. Managing Director
  6. Managing Director
  7. Managing Director
  8. Managing Director
  9. Managing Director
  10. Managing Director
  11. Managing Director