This project consists of the removal of existing in-water piling, dolphins, trestle, and gangway and the installation of in-water piling for use as falsework support; earthwork; construction of cofferdam with permanent ground anchors; cast-in-place concrete abutment with drilled shaft piling; and backstay foundations with micropiles. Construction of cast-in-place concrete and MSE gabion retaining walls; 3,480 square foot cable stayed pier consisting of cast in place concrete, steel mast, cables, wood decking, storm drainage, railings, and lighting. Plaza construction consisting of a cast-in-place concrete base with a stone and concrete paving unit finish, cast-in-place walls, terraced wood seating and site furnishings.